MADE-TO-MEASURE CABINETRY ARCHITECTURAL JOINERY SHENZHEN ยท CHINA ENQUIRE ↗

05 / PROCESS

Six stages.
No gaps between them.

Brief → drawings → samples → production → loading05 / 06
06PROCESS

ONE CHAIN, SIX CHECKPOINTS

A project that moves
in defined steps.

Each stage ends with something approved in writing. Nothing moves to the next stage on a verbal yes, and nothing is cut before the sample record is complete. That structure is what keeps a container from arriving with the wrong edge band.

01

Brief & feasibility

We read the plan, the drawings or the photographs, then answer with what is buildable, what needs a sample, what is a special build and what information is missing.

You receive: a written scope outline and a question list.
02

Drawing development

Module sizes, elevations, sections, internal layout, appliance integration, wall build-up and door swings are drawn to the point where panels can be listed.

You approve: the drawing set, revision by revision.
03

Samples & specification freeze

Board, edge band, veneer grade and sequence, lacquer sheen, hardware set and finish are assembled into a sample set. The specification is frozen against it.

You approve: the physical sample record.
04

Production & inspection

Panels are processed and edged, doors assembled, units built and checked against the drawing set: dimensions, quantities, edge quality, hardware positions, finish match.

You receive: inspection notes and photographs.
05

Packing, loading & documents

Elements are marked by room and module, corners and edges protected, and the load built against a plan. The packing list mirrors the drawing set.

You receive: packing list, loading photographs, export documents.
06

Freight & handover

Freight & handover

Freight, insurance, customs and delivery are arranged per project, with the receiving party named. Installation and site adjustment sit with you or your installer.

You confirm: the receiving party and the delivery window.

What adds time — honestly

  • Non-standard substrate, radius or species selection: typically 5–15 working days.
  • Mixed finish packages on one order (board plus veneer plus lacquer) need separate sample rounds.
  • Sample revisions after approval restart the finishing sequence for the affected elements.
  • Incomplete appliance or fittings data stalls door and drawer sizing, not production capacity.
  • Pre-holiday periods in the production calendar compress capacity. We tell you when a date is unrealistic rather than accept it.

What never comes from us

  • Published prices, or a price before the specification is frozen.
  • A delivery guarantee at quotation stage.
  • Site measurement, installation or on-site adjustment.
  • Customs clearance, duty, destination tax or compliance certification.
  • A warranty to an end consumer, or a claim that a board label certifies a finished cabinet.
NEXTStart a project ↗